VRLA FIRST POWER Battery

FP-LogoBattery_Series_Standard

 

FirstPower Technology Co., Ltd. was set up as a manufacturer of rechargeable batteries in 1993 and now has three plants ( one in Yixing city, one in Xiaoguan city and the other in Huizhou city), with total manufacturing facilities of around 80,000 square meters. FirstPower generated, with a group of highly qualified staff in the rechargeable battery industry in China and overseas, from a good demand for quality batteries. It has enjoying a sound reputation for proven quality batteries ever since. Now we can produce 10 series batteries to meet different applications.
FirstPower brings you not only reliable battery and technology, but also excellent services and real value you shall expect and enjoy.

 

Firstpower applies the most advanced equipments and continual improved artworks to organize the production process.

Production Process of Firstpower Batteries

FP-Fabric

 

International certifications:

  • ISO9001 approval, FN: Q3105105131
  • ISO14001 CTC04912E10302ROM
  • OHS MS18001 04912S10150ROM
  • UL approval, FN:MH28204
  • CE approval, FN:G2M20201-0102-E-16
  • KS approval, FN:KS C 8519
  • VDS approval
  • BS approval

 

The QC department consists of IQC,IPQC, QA, QE, OQC, laboratory and testing subsidiaries’ which strictly meets ISO9001 quality system requirements from in-house material to batteries out warehouse to make sure the products are under the strict audit in the whole process. The defective rate is below 0.1%. Meanwhile, Firstpower take analytical pure material to make sure the batteries with high quality, long life, low self discharge advantages.

Production Process of Firstpower Batteries

FP-ProductPage

Researching & Development

RD

Firstpower cooperates with Harbin institute of technology and Fudan University which are leading universities about electrochemistry in China to set up the R&D center. The engineers of R&D department have worked in electrochemistry area since 1990. The supervisors of QC and production departments are all with sufficient experience in VRLA battery industrial over 25 years.

FirstPower R&D Framework

RD2